Skip links

Brass Rod / Brass Flat Bar Production Price List

high standards of production...
image_pdfimage_print

PRODUCTION PRICE LIST

20 March 2025

SALES PRICE LIST (KG/TL)

DIAMETER CASH-TL 30 DAY 60 DAY 90 DAY
4,80 mm 311,00 5,50% 11,00% 16,50%
5-7 mm 308,00 5,50% 11,00% 16,50%
8-12 mm 303,00 5,50% 11,00% 16,50%
13-70 mm 298,00 5,50% 11,00% 16,50%
5-9 mm Klemens 308,00 5,50% 11,00% 16,50%
10-20 mm Lama 307,00 5,50% 11,00% 16,50%
Pres Malı 298,00 5,50% 11,00% 16,50%

CONTRACT PRICE LIST (KG/TL)

DIAMETER CASH-TL 30 DAY 60 DAY 90 DAY
4,80 mm 38,00 5,50% 11,00% 16,50%
5-7 mm 37,00 5,50% 11,00% 16,50%
8-12 mm 35,00 5,50% 11,00% 16,50%
13-70 mm 34,00 5,50% 11,00% 16,50%
5-9 mm Klemens 38,00 5,50% 11,00% 16,50%
10-20 mm Lama 39,00 5,50% 11,00% 16,50%
Pres Malı 34,00 5,50% 11,00% 16,50%

Copper (Cu) Price: 9.958,50 USD/Ton

Zinc (Zn) Price: 2.911 USD/Ton

TCMB Dollar Exchange Rate: 38,0036 TL

TERMS OF SALE

– Our prices do not include VAT.
– Payments (check, cash, money order, eft etc.) are collected before delivery of goods or at the order stage.
– For unpaid orders, the list price on the release date is applied.
– We do not sell more than 90 days on credit. Maturity will be specified during the order.
– In contract orders, all of the sawdust is collected before material shipment or at the delivery of the material.
– Our price list may change according to the extreme ups and downs in foreign exchange and metal exchange.
– Our sales are based on the company scale.
– This price list cancels the previous price list.
– Contract manufacturing melting and oil waste will be deducted separately.

Kaplan Pirinç Fiyatlar
Return to top of page